Keep an underground-cable note separate from the hired-plant condition record
Keep underground-services note sources, identifiers and supplied scope distinct from hire condition photographs. Practical documentation examples for rental teams.
By AuditIt Editorial Team · Fact checked

What to know
- Keep the underground-services note and condition record separately attributable.
- Preserve the source, identity and scope exactly as supplied.
- Mark a missing or mismatched reference as unresolved.
A services plan, a locator record and a machine condition photograph have different sources. Keep their references distinct even when they arrive together. The document file should show which plan revision and which supplied record a colleague is reading.
Separate the plan reference from the locator record
Use the issuing source, revision and supplied area description to identify a plan. Give any locator record its own author and time. This guide does not locate a service, identify a live cable or provide an excavation method.
The Great Britain source used for this note is HSE’s Electricity – underground cables. Use that source for its own guidance and context. The filing format below is an editorial suggestion for keeping supplied records attributable; it does not reproduce a legal test, technical procedure or operating decision.
A suggested documentation note
- Services-plan issuer, reference and supplied revision.
- Separate locator-record author, reference and recorded time.
- Related asset record and any missing or mismatched document scope.
Follow the references through a fictional file
The fictional job DIG-A has PLAN-A and a later locator note that refers to PLAN-B. The coordinator preserves both references and records the mismatch. The excavator photograph stays in the handover file; it does not reconcile the plans or establish what lies underground.
The condition record in AuditIt
For the condition photographs, AuditIt’s equipment checkout-and-return starter compares two stages. Equipment damage and pre-hire starters are single-visit records. These equipment workflows sit within the wider catalog.
Connect the condition record to the supplied underground-services note through a document reference or a separately labeled note. The proposed fields above are editorial suggestions, not a claim that those fields are shipped defaults. The equipment checkout-and-return guide describes the existing condition workflow; explore AuditIt if it fits your process.
AuditIt creates tamper-evident, human-review-ready records. It is not legal certification and does not determine liability. Keep any technical or legal decision attributable to its own evidence and the appropriate reviewer.
Prepared with AI assistance. Editorial review: AuditIt Editorial Team.
Direct answers
Frequently asked questions
How should a plan and locator note be connected?
Keep both references and retain the plan version named in the locator note. Flag a version mismatch for clarification instead of changing one reference to match the other.
Does a machine photograph establish the position of buried services?
The photograph records its submitted view. Keep service plans and locator information separately attributed, with any technical interpretation left to the appropriate review.
Sources
- Electricity – underground cables, Health and Safety Executive
- underground cables
- equipment rental
- condition records
- buried services


